Fabrication & Finishing
Steel fabrication, PVC stretching, aluminium finishing and completed workshop production.
Open Stage 02 →This walkthrough moves across the finished Goodwill and Crown Crane structures inside the production area after the steel frames, printed PVC stretching and aluminium-edge finishing had come together. The different hardware-front artworks are visible as completed physical signage, not loose printed media.
The sequence leading into this result—from frame fabrication through PVC stretching and aluminium finishing—is captured in the wider Stage 02 production work.
The completed lineup shows the result of the parallel production schedule: different Goodwill and Crown Crane hardware-front signs finished as framed units and gathered ahead of field deployment.

The wide production photograph holds the completed framed signs together after finishing. Mounting and final hardware-front placement are still ahead on the Central Uganda installation routes.
The completed framed signage and prepared graphics now move into route-based installation across Kampala and Central Uganda, where the signs will be mounted and the specified adhesive graphics applied at the hardware fronts.