Fabrication & Finishing
Steel fabrication, PVC stretching, aluminium finishing and completed workshop production.
Open Stage 02 →This outside walkthrough records the completed Goodwill and Crown Crane framed PVC signs after workshop production. The aluminium-finished structures are together and ready to move from production into the planned installation routes.
“Ready for dispatch” is the exact stage shown here. The signs are not presented as installed: hardware-front mounting, alignment and the finished site views belong to the next field-installation stage on the Goodwill master project.
The outside view is the handover point between completed workshop production and the route-based installation work still ahead across Kampala and Central Uganda.

The photograph holds the finished framed signs together after fabrication and aluminium finishing, ready for deployment. The remaining work is on site: delivery, mounting, alignment and the specified vinyl applications.
The completed framed signage and prepared graphics now move into route-based installation across Kampala and Central Uganda, where the signs will be mounted and the specified adhesive graphics applied at the hardware fronts.