Field Installation
The full route deployment across Kampala and Central Uganda.
Open Stage 03 →This brief clip catches the point where completed production became field movement. The framed face had already passed printing, fabrication, stretching and aluminium finishing; it was now being handled into the route sequence for delivery.

Each face carried its assigned hardware name. The lineup kept those destinations visible before loading and separated the field work by route.