Field Installation
The complete multiple-route deployment and installed frontages.
Open Stage 03 →The camera moves across the completed Kisekka Cheap General Hardware treatment after mounting: the long storefront face and two equal signs directed toward opposite lines of approach.
The site formed part of the Kampala route alongside JM Firstset on Sixth Street and Apex Hardware in Namuwongo.

The frame in this photograph became the main frontage in the walkthrough. Two additional equal-format signs were mounted for visibility from both directions of approach.