One stage in a 100 m² rooftop installation
Two team members open and spread the extra-large printed PVC face across the rooftop before it is raised onto the existing structure.
This clip belongs to the documented sequence covering preparation, rooftop unfolding, upper-edge alignment, lower tightening and the completed street view.
