One stage in a 100 m² rooftop installation
A team member works high on the right-side support while the billboard’s upper edge is aligned and brought under tension.
This clip belongs to the documented sequence covering preparation, rooftop unfolding, upper-edge alignment, lower tightening and the completed street view.
