Goodwill rooftop billboard • Nakasero

Goodwill Nakasero Billboard PPE, Tools and Team Preparation

The rooftop team assembled helmets, protective wear, tools and the printed face before the 100 m² installation began.

Recorded September 2026 • 12.42 seconds • Landscape 640 × 360
The rooftop team assembled helmets, protective wear, tools and the printed face before the 100 m² installation began.

One stage in a 100 m² rooftop installation

The rooftop team assembled helmets, protective wear, tools and the printed face before the 100 m² installation began.

This clip belongs to the documented sequence covering preparation, rooftop unfolding, upper-edge alignment, lower tightening and the completed street view.

See the complete 20 m × 5 m installation record →